THE IRC 2025 FINALS

The «Rover Challenge» competition provides an environment for students to gain real-world engineering and project management experience. In 2025 the contest consisted of five main tasks.

 

  1. ASTROBIOLOGY EXPEDITION (ABEx) and Scientific Presentation (PP&Report). The rover fills the role of mobile science laboratory, searching for signs of life with the variety of atmospheric and geological equipment.
  2. RECONNAISSANCE AND DELIVERY OPERATION (RDO). The Rover has to traverse challenging terrain to locate and several objects of interest and deliver them to designated coordinates.
  3. AUTONOMOUS EXPEDITION (AutEx). During this stage the rover has to autonomously drive through several checkpoints, marked by visual clues.
  4. INSTRUMENT DEPLOYMENT AND MAINTENANCE OPERATION (ID&MO). The rovers traverses a short distance to operate on a mock-up instrument panel to perform a set of precise operations.
  5. Project Implementation and Management Assessment (PIMA) procedure. PIMA procedure is a presentation of project implementation and assessment of its management.

 

On all stages the operators do not have a line of sight with the rover. They control it using only sensor and camera data.

 

Jan 28- Feb 2, 2025.

THE IRC 2025 FINALS

The «Rover Challenge» competition provides an environment for students to gain real-world engineering and project management experience. In 2025 the contest consisted of five main tasks.

ASTROBIOLOGY EXPEDITION (ABEx) and Scientific Presentation (PP&Report).

The rover fills the role of mobile science laboratory, searching for signs of life with the variety of atmospheric and geological equipment.

RECONNAISSANCE AND DELIVERY OPERATION (RDO).

The Rover has to traverse challenging terrain to locate and several objects of interest and deliver them to designated coordinates.

AUTONOMOUS EXPEDITION (AutEx).

During this stage the rover has to autonomously drive through several checkpoints, marked by visual clues.

INSTRUMENT DEPLOYMENT AND MAINTENANCE OPERATION (ID&MO).

The rovers traverses a short distance to operate on a mock-up instrument panel to perform a set of precise operations.

Project Implementation and Management Assessment (PIMA).

PIMA procedure is a presentation of project implementation and assessment of its management.
On all stages the operators do not have a line of sight with the rover. They control it using only sensor and camera data.

 

Jan 28- Feb 2, 2025.
1

Competition

25

Teams in the finals

1000

Participants

6th

Our ranking

IRC – International Rovers Collaboration 2025.

Our partners

Get in touch

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.